Preparation of Detailed Project Report


Preparation of Detailed Project Report (DPR) for “Investment Grade Energy Audit” for Residential Buildings/ Hotels/ Institute/ Commercial Complex

  • The Energy Department Govt. of Rajasthan has issued Energy Conservation Building (ECB) directives for efficient use of energy and its conservation in buildings or building complexes vide Notification No. F20(6) / Energy/ 98/ ECBC/ Jaipur Dt. 30.03.2012 and has made it mandatory that all existing Commercial malls, Plazas, High Rise Building , Cine Plexus and mixed used Buildings ( Residential & Commercial ) having connected load of 100 KW and above or contract demand 120 KVA and above or conditioned area of 1000 Sqm and above in the state of Rajasthan shall get conducted Energy Audit once in every three years by Accredited Energy Auditors/ Energy Manager/ Accredited Energy Audit firms.
  • ‘SAMTA POWER’ has been providing consultancy services for project development and project facilitation service in power sector since 2006 and is having dedicated team of Expert Engineer and Accredited Energy Auditors/ Energy Managers.

Scope of works

OBJECTIVE OF INVESTMENT GRADE ENERGY AUDIT

The objective of investment grade energy audit is to review the present energy consumption scenario, monitoring and analysis of the use of energy and explore the energy conservation options in various load centers of the buildings including submission of detailed project report containing recommendations for improving energy efficiency with cost benefit analysis and technical specification for any retrofit option with list of suppliers/manufacture of energy efficient technologies.

SCOPE OF WORKS OF INVESTMENT GRADE ENERGY AUDIT

The scope of the works includes a details study for energy conservation option of various energy sources like. Electricity and Fuel Oil in the building and recommendations action for reducing  the same.

The scope of the study will be as per following

S.N.

Particulars

1

Review of present Electricity, Fuel Oil & Estimate of energy consumption in various load centers lighting, air-conditioning , Water Pumping etc.

2

Review of present electrical distribution system and exploring energy conservation option (ENCON) in electrical distribution system.

3

Review of present lighting system. Lighting inventories etc & exploring the energy conservation option (ENCON) in lighting system.

4

Review of present Heating, Ventilation and Air Conditioning system (HVAC system) & exploring the energy conservation option (ENCON) in HVAC system

5

Review of D.G set operation & exploring the energy conservation option (ENCON)  in DG set

6

Review of Water Pumping, Storage and Distribution System & Exploring the energy conservation option (ENCON) in Water Pumping System.

7

Study of thermal Fluid Heaters/Boilers and exploring the energy conservation option (ENCON) in the system.

8

Conducting the motor load survey of all drives to estimate % loading & exploring the energy conservation option (ENCON) in electric drive system.

9

Detail review of present energy monitoring and accounting system & recommend for effective monitoring & accounting system.

10

Cost benefit analyses of each the energy conservation option (ENCON)   indicating simple payback period, return on investment(ROI) & internal rate of return(IRR)

11

Preparation of details project report and submission of the same to the client/authority


Image
Image
Image